Client: Stonehage Flemming
Project: Liberation House (2024)
The project team at IPM approached Aston Services to survey SHF's new premises at Liberation House and work with the Architects (EDP) to re-design the M&E services to meet the design intent.
The existing office required a comprehensive refurbishment to enhance functionality, aesthetics, and sustainability. The objective was to create a modern workspace that reflects the company’s brand values while meeting the demands of a dynamic work environment.
A full M&E design and performance specification were carried out in-house. The final design was vetted and approved by independent consultants at TnG Engineering.
After successfully tendering the Mechanical & Electrical Services package, we worked alongside the main contractor, ROK, to compile the program.
Aston Services Limited is proud to have been entrusted to carry out the following services for this complex project:
- M&E Designs & CAD drawings
- Electrical Installations
- Ventilation Installation & Ductwork for Commercial Kitchen
- Heat Recovery Ventilation
- VRF Air-conditioning
- AV Installations Cabling
- Plumbing Installation
- Fire Alarm and Security Installations.
- Data Installation
Many thanks also to our sub-contractors
- Ductwork Systems
- PPS
- SCS