Case Study

Client: KP Services

Project: Mechanical & Electrical Services

After successfully tendering for the Mechanical & Electrical Services package provided by the client appointed consultants Aston Services Limited were asked to provide alternative value engineered schemes without compromising the stringent design criteria required for the operation of the KP Services printing plant at Rue de Pres Trading Estate.

Following our inspection of a similar installation in France and by liaising with their technical team, Aston Services Limited were able to provide a solution for the new installation.

With a completion deadline looming, we worked closely with the project team, issuing combined services drawings, supplying all technical information, environment data and product selection options.

With a tremendous amount of co-ordination work with the client, main contractor, architect, consultants, utility companies and sub-contractors the project was finally delivered before schedule, to the highest standard and within budget.

Aston Services Limited are proud to have been entrusted to carry out the following services for this complex project:

  • Electrical Installations - including 2400amp LV Switchgear & Distribution
  • HVAC Installations & Ductwork  - Including chilled water & control wiring
  • Atlas Copco Compressed Air Installation
  • Plumbing Installation
  • Heat Recovery Ventilation
  • Fire Alarm and Security Installations.
  • Data Installation

Many thanks also to our sub-contractors Ductwork Systems and G4S.